top of page

High Grade Lithium Assays Returned From McCombe and Drilling Resumed at Seymour and Root


HIGHLIGHTS

  • Assays received for a further 11 diamond holes at McCombe, Root including: - RL-22-0041: 15.9m @ 1.12% Li2O from 98.1m (incl. 6.0m @ 1.91% Li2O from 99.0) - RL-22-0027: 12.3m @ 1.34% Li2O from 3.4m (incl. 11.4m @ 1.41% Li2O from 4.2m) - RL-22-0035: 12.7m @ 1.28% Li2O from 66.5m - RL-22-0038: 8.4m @ 1.18% Li2O from 81.5m (incl. 5.0m @ 1.91% Li2O from 81.5m)

  • Phase 2 McCombe extensional drilling continuing to explore the lithium bearing pegmatites along strike and down dip

  • All weather camps operational with full complement of staff

  • All weather roads connecting camps to airports and Thunder Bay

  • 6 diamond drill holes completed, and logging and assaying commenced at Morrison, Root

  • Maiden Root Mineral Resource Estimate, on track for Q1 2023

“The high-grade assay results received from Phase 2 extensional drilling at McCombe demonstrate continuation of the lithium bearing pegmatites along strike and down dip. Several additional lithium bearing pegmatites have been intersected to the north-east and drilling will continue to delineate their extent”.


“The second drill rig mobilised to the Morrison prospect just before Christmas and completed 6 diamond holes, all intersecting pegmatite. Logging and assaying are now underway with the rig continuing in a north & west direction towards McCombe” - GT1 Chief Executive Officer, Luke Cox




Comments


Drop us a line

FILL IN THE FORM BELOW TO GET IN TOUCH 

Thank you for your enquiry, we will get back to you shortly

Powered by

What does the Coup logo mean?

coup-logo (1).png

Find our ASX Feed here

  • Twitter
bottom of page