top of page

Further Extensional Drilling Success At North Aubry



HIGHLIGHTS


  • Further diamond drilling assay results returned from North Aubry (Seymour Project) including:

    • Hole GTDD-22-0323 intersected 17.9m and 7.7m thick pegmatites with significant intercepts:

- 6.0m @ 1.37% Li2O (from 218.9m to 225.0m); and

- 3.6m @ 2.08% Li2O (from 378.3m to 382.0m).

  • Hole GTDD-22-0128 intersected 6.4m and 22.8m thick pegmatites with significant intercepts:

- 2.8m @ 1.48% Li2O (from 253.3m to 256.2m); and

- 3.4m @ 0.86% Li2O (from 322.8m to 326.3m).

  • Hole GTDD-22-0320 intersected 10.7m thick pegmatite with significant intercept of:

- 10.7m @ 1.49% Li2O (from 458.1m to 468.8m).

  • Intersections considerably thicker than modelled and significantly increases the mineralised volumes and grade in this targeted strike extension of North Aubry.

  • Drilling at Seymour now targeting lateral extents of the Aubry Complex and testing numerous pegmatite exposures within the Pye Complex.

  • Drilling at Root Project set to commence shortly with additional equipment mobilised to site.

  • Root hosts known high-grade pegmatites ready for drilling and Mineral Resource Estimation.



Comments


bottom of page